description1
Zipper closure 1/4 zip athletic pullovers for men. Stretchy, lightweight, fast-drying fabric for superior performance. REGULAR FIT - US standard sizes. An athletic fit that sits close to the body for a wide range of motion, designed for optimal performance and all day comfort. FEATURES - Quarter zip closure;Thumbholes on long sleeves to keep them in place during workout
Details
Description
 

 

Nous avons de l'expérience avec les glissières de sécurité de type russe, il y a quatre lignes au total:① ligne de profilage de glissière de sécurité à deux ondes, ② ligne de profilage de poteau en U,③ ligne de poinçonnage de connexion et ④ ligne de poinçonnage de vent final.

Cette ligne de profilage en U peut être conçue pour une épaisseur de 4-5mm, elle est largement utilisée comme poteau de garde-corps. Nous utilisons des supports en fer forgé (voir photo) et un entraînement par boîte de vitesse pour s'assurer que cette machine puisse travailler longtemps dans une situation stable.

We had experience of Russian type Guardrail, there are four lines totally:① two wave guardrail roll forming machine, ② U post roll forming machine,③ connection punching line and ④end wind punching line.

This U Roll Forming Machine can be designed for thickness 4-5mm, it is widely used as post of guardrail. We use forged iron stands(see picture) and gearbox driving to make sure this machine can longly work in a stable situation.

 

The flow chart of U post roll forming machine:

Hydraulic decoiler-Leveling-Punching-Roll forming machine-Cutting-Out table
Technical specification

Two Waves/Three Waves Highway Guardrail Roll Forming Machine

No.

Item

Specification

Optional

1

Suitable material

Type:Galvanized Coil, PPGI, Carbon steel Coil

 

 

 

Thickness(mm):4-5

 

 

 

Yield strength: 250 - 550MPa

 

 

 

Tensil stress( Mpa):G350Mpa-G550Mpa

 

2

Nominal forming speed(m/min)

15

Or according to your requirement

3

Forming station

10-12

According to your profile

4

Decoiler

Hydraulic decoiler

 

5

Main machine motor

Sino-German Brand

Siemens

6

PLC brand

Siemens

Panasonic

7

Inverter brand

Yaskawa

 

8

Driving system

Gearbox drive

Chain drive

9

Rollers’ materail

Cr12

GCr15 or #45 Steel

10

Station structure

Forged Iron station

 

Wall panel station
Or torri stand structure

 

11

Punching system

No

Hydraulic punching station or Punching press

12

Cutting system

Post-cutting

Pre-cutting

13

Power supply requirement

380V 60Hz

Or according to your requirement

14

Machine color

Industrial blue

Or according to your requirement

How does LINBAY MACHINERY make installation during COVID-19?
The installation of roll forming machine during COVID-19 is for free!
Hereby LINBAY will explain how we do the installation of our roll forming machine.

First, we adjust the machine in our plant, we will ask which size you are going to produce first, we put the machine in the size it is going to produce and adjust all the correct parameters before the shipment, so you do not need to change anything when you got this machine.

Second when we disassemble the machine for debug, we take videos so that you know how to connect them. Each machine has its video. In the video, it will show how to connect the cables and tubes, put the oils, put together the physical structures etc ...

Here is an example of that video: https://youtu.be/p4EdBkqgPVo

Third, when you receive the equipment, you will have a wahtsapp or wechat group, our engineer (He speaks English and Russian) and I (I speak English and Spanish) will be in the group to support you in any doubt.

Fourth, we send you a manual in English or Spanish so that you understand all the meanings of the buttons and how to start the machine.

We have a case that my client from Vietnam received his machine on November 25, and put it on brand at night, and started producing on November 26. And besides this, we have achieved many successes in installing more complicated machines. There is no problem with the installation of your machine. LINBAY offers the best quality and the best service for our clients, especially in this situation. You don't have to wait until the COVID pass. You can produce the profiles right away with our machines.
More Pictures
 
Profile drawings
 
 
Optional configuration
  • Out table
    • Non-powered
    • Auto stacker
    •  
    •  
    •  
    •  
  • Cutting
    • flying shear
    • Saw cutting
    •  
    •  
    •  
    •  
  • Driving
    • chain drive
    • gearbox drive
    • gearbox drive with coupling
    •  
    •  
    •  
    •  
  • Stands
    • wall panel
    • torri stands
    • forged iron
    • ruler
    •  
    •  
    •  
    •  
  • Punching
    • punching press
    • hydraulic punching station
    • roller punch
    •  
    •  
    •  
    •  
  • Feeding
    • Leveler
    • servo feeder
    •  
    •  
    •  
    •  
  • Decoiler
    • manual decoiler
    • hydraulic decoiler
    • double head decoiler
    •  
    •  
    •  
    •  
Installation during COVID-19
How does LINBAY MACHINERY make installation during COVID-19?
The installation of roll forming machine during COVID-19 is for free!
Hereby LINBAY will explain how we do the installation of our roll forming machine.

First, we adjust the machine in our plant, we will ask which size you are going to produce first, we put the machine in the size it is going to produce and adjust all the correct parameters before the shipment, so you do not need to change anything when you got this machine.

Second when we disassemble the machine for debug, we take videos so that you know how to connect them. Each machine has its video. In the video, it will show how to connect the cables and tubes, put the oils, put together the physical structures etc ...

Here is an example of that video: https://youtu.be/p4EdBkqgPVo

Third, when you receive the equipment, you will have a wahtsapp or wechat group, our engineer (He speaks English and Russian) and I (I speak English and Spanish) will be in the group to support you in any doubt.

Fourth, we send you a manual in English or Spanish so that you understand all the meanings of the buttons and how to start the machine.

We have a case that my client from Vietnam received his machine on November 25, and put it on brand at night, and started producing on November 26. And besides this, we have achieved many successes in installing more complicated machines. There is no problem with the installation of your machine. LINBAY offers the best quality and the best service for our clients, especially in this situation. You don't have to wait until the COVID pass. You can produce the profiles right away with our machines.
 
 
 
 
 
 

Contactez-nous!